EI收录 |
[1] 张云华,丰景春,李明,张可,杨圣涛. 互惠性偏好视角下PPP项目社会资本控制权分配模型[J]. 控制与决策. 2018, 33(3): 514-520 [2] 张云华,谢洪涛,郑俊巍,沈俊鑫. PPP项目执行阶段控制权动态调整机制的演化博弈.系统工程理论与实践 [3] Zhang Yunhua, Feng Jingchun, Li Xinpeng. Modeling foreseeable risk factors affecting the contractors profit in the international EPC project [J]. International Journal of Simulation: Systems,Science and Technology.2016, 17(37):29-1~29-8 [4] Zhang Yunhua,Feng Jingchun,Yang Shengtao. Allocation of Control Rights in the PPP Project: a Cooperative Game Model [J]. IOP Conference Series: Earth and Environmental Science, 2017.6, 69:0-012075 |
ISTP收录 |
[1] Zhang Yunhua, Feng Jingchun, Zhang Ke. Influential factors and assessment of WTP for improving water environment in rural areas of Western China[C]. International Conference on Economy, Management and Education Technology (ICEMET 2015) |
CSSCI收录 |
[1] 张云华,丰景春,张可,严华东. 完全理性与互惠偏好下PPP项目控制权激励模型比较研究:基于私人部门之间的控制权配置[J].管理工程学报.2019, 32(4):151-158 [2] 张云华. PPP项目控制权初始分配决策研究[J]. 软科学,2020, 34(02):44-49 [3] 张云华,丰景春,薛松. 水利基础设施PPP项目剩余控制权优化配置模型[J]. 科技管理研究. 2017, 37(01): 189-193 |